Here are the road closures for the city of Renton during the week of July 28.
• Rainier Avenue N. will have intermittent lane closure between S. Third Street and Airport Way for construction work from July 28 to August 1, 8 a.m. to 3 p.m.
• NE 12th Street will have intermittent lane closures from Union Avenue NE to Pierce Place NE for utility installation from July 28 to August 1, 8 a.m. to 3 p.m.
• 152nd Avenue SE will have southbound lane closure at 15300 152nd Avenue SE for asphalt repairs on July 30, 7 a.m. to 4 p.m.
• N. 36th Street will be closed from Burnett Avenue N to 1104 N 36th Street for asphalt repairs on July 29, 7 a.m. to 4 p.m.
• SW Grady Way will have westbound lane closure at 1110 SW Grady Way for asphalt repairs on July 28, 7 a.m. to 4 p.m.
I-405 Closures
• Up to three lanes of northbound I-405 from the northbound I-5 off-ramp (milepost 2) to the SR 169 off-ramp (milepost 4.5) will be closed nightly, July 28 to August 1, 11:59 p.m. to 4 a.m.
• Up to two lanes of northbound I-405 from milepost 6 to milepost 9 will be closed nightly, July 28 to August 1, 9:15 p.m. to 4:30 a.m.
• Up to two lanes of southbound I-405 from SR 900 (milepost 5) to Sunset Boulevard N. (milepost 3) will be closed nightly, July 28 to August 1, 10:30 p.m. to 4:30 a.m.
• The northbound I-405 on-ramp from northbound SR 167 will be closed nightly, July 28 to August 1, 10:30 p.m. to 4:15 a.m. A signed detour will be in place.
• The northbound I-405 on-ramp from Talbot Road S. will be closed nightly, July 28 to August 1, 10 p.m. to 4:30 a.m. A signed detour will be in place.
• The southbound I-405 off-ramp to SR 515 / Talbot Road S. will be closed nightly, July 28 to August 1, 10:30 p.m. to 5 a.m. A signed detour will be in place.